Cost-Savings and Adaptability
This project involved the complete demolition and fit-up including a fire alarm system, distribution, branch power and lighting/lighting control in an existing, occupied heritage building with both wood and concrete structure including asbestos. AM-TECH also installed security wiring and camera wiring which led back to a designated security point. AM-TECH provided cost savings by utilizing creative prefabrication techniques for pre-wire lighting, walls and panels while remaining on schedule and overcoming the existing outdated electrical conditions with ease.