  • Electrical Upgrades
    Hudson’s Bay – Rideau Centre

    AM-TECH’s extensive experience in developing unique solutions to conform to tight schedules is highlighted in our complete fit-up of the Hudson’s Bay in Rideau Centre where we creatively utilized efficient fabrication and installation techniques in outdated existing electrical conditions.

    Cost-Savings and Adaptability

    This project involved the complete demolition and fit-up including a fire alarm system, distribution, branch power and lighting/lighting control in an existing, occupied heritage building with both wood and concrete structure including asbestos. AM-TECH also installed security wiring and camera wiring which led back to a designated security point. AM-TECH provided cost savings by utilizing creative prefabrication techniques for pre-wire lighting, walls and panels while remaining on schedule and overcoming the existing outdated electrical conditions with ease.

    • Lighting Installation
    • Fire Alarm Systems
    • Security and Camera Wiring
    • Distribution
    • Branch Power
    • Prefabrication
    • Occupied Building
    • Heritage Building
    • Asbestos Present
    • Limited Timeline
    Our Client’s Thoughts

    Due to the occupied site and limited timeline, Mr. Tapper (Vice President of HBC Construction), was extremely impressed when AM-TECH completed the base contract in a timely fashion and consistently remained on schedule despite helping overcome numerous ESA deficiencies caused by the age of the building and state of the historic wiring.