Confederation Heights Fire Alarm Fit Up
The project involved demolition in 6 secure buildings at Confederation Heights (all of which filter back to the base building), followed by the installation of a new networked fire alarm system in each, and new base building lighting and fit up. All power was shut down and disconnected, and components were removed, including fire alarm devices. A new base building fire alarm system was installed including sprinkler valves, smoke detection, door security connection, speakers and heat/smoke detectors including all new conduit and risers. Base building lighting systems in each building were upgraded.