2405P St Laurent Blvd, Ottawa, ON K1G 5B4
Mon-Fri 07:00 AM - 04:30 PM
2405P St Laurent Blvd, Ottawa, ON K1G 5B4
Mon-Fri 07:00 AM - 04:30 PM
Electrical Upgrades
Hudson’s Bay – Rideau Centre

AM-TECH’s extensive experience in developing unique solutions to conform to tight schedules is highlighted in our complete fit-up of the Hudson’s Bay in Rideau Centre where we creatively utilized efficient fabrication and installation techniques in outdated existing electrical conditions.

Cost-Savings and Adaptability

This project involved the complete demolition and fit-up including a fire alarm system, distribution, branch power and lighting/lighting control in an existing, occupied heritage building with both wood and concrete structure including asbestos. AM-TECH also installed security wiring and camera wiring which led back to a designated security point. AM-TECH provided cost savings by utilizing creative prefabrication techniques for pre-wire lighting, walls and panels while remaining on schedule and overcoming the existing outdated electrical conditions with ease.

  • Lighting Installation
  • Fire Alarm Systems
  • Security and Camera Wiring
  • Distribution
  • Branch Power
  • Prefabrication
  • Occupied Building
  • Heritage Building
  • Asbestos Present
  • Limited Timeline
Our Client’s Thoughts

Due to the occupied site and limited timeline, Mr. Tapper (Vice President of HBC Construction), was extremely impressed when AM-TECH completed the base contract in a timely fashion and consistently remained on schedule despite helping overcome numerous ESA deficiencies caused by the age of the building and state of the historic wiring.